Ensure any engine control switch is set to the run position, with the load disengaged. Manually set the air shut off valve (if fitted) to the run position (see Fig. 18), Turn the key switch to the start position, which will energize the solenoid allowing the engine to crank over for a few seconds then start diesel generator set . Check the instrument panel is showing normal running oil pressure, and the ammeter for charge to the engine batteries. Allow the engine to run for five minutes checking the instruments are reading correctly. Stop the engine and check the oil and coolant levels, replenish if necessary. Key 1. Position - closed 2. Position - Open WARNING!! The cooling system is pressurized - do not remove the filler cap from the radiator whilst the engine is hot. Hand protection must be worn. Engine Shutdown The engine is normally stopped by operating an electric stop control via a key switch. In this case it is only necessar...
We share Technical Support and News about generators. Diesel generator set supply/Manufacture