Skip to main content

Posts

Showing posts from June 14, 2020

Archive

Show more

How to deal with diesel genset room problem

When selecting the plane position of the machine room for plane layout of the machine room, it should be adjacent to the power transformation and distribution room as much as possible, because it is convenient for wiring, reducing the loss of materials and electric energy, and also convenient for management. If conditions permit, the machine room is preferably located on the first floor, which is convenient for ventilation, heat dissipation and smoke exhaust . Genset in machine room However, in high-rise buildings and large and medium-sized commercial buildings, the first floor is usually used as a commercial house, and the owner generally does not agree with this plan, but often places the machine room in the basement. At this time, the following points should be paid attention to in selecting the location of the machine room: (1) The machine room should have one side against the outer wall, so that the equipment ventilation and smoke exhaust are easier to handle. (2) Attention shall

1000kw 1250kva Power Generators with Cummins Engine

Yuchai 200KW Silent Diesel Generator Genset

Safety operation of 640KW diesel genset

It is important to ensure 800kva generator set operate safely when using diesel generator. How to do it? Today Starlight Power answers for you. 1. Check all indicating instruments according to the specified time, and pay attention to the pressure of lubricating oil and whether the water temperature changes. The pressure of lubricating oil and the temperature of cooling water must be within the specified value. 2. Check the crankcase oil level, fuel tank oil level and radiator water level, and make up if it is lower than the normal position. 3. Frequently observe whether the instruments and alarm indicators of the distribution panel are normal. Where the red light is on, it means there is a fault, and the green light is the normal operation indicator. 4. Check whether the charger is charging normally. 5. Listen to whether the operation sound of each part of the unit is normal. 6. Check whether the temperature of the shell of the hand mold body, the shell of the bearing part

The parallel cabinet for 250KW generator set

The parallel cabinet for 250KW generator set is basically equipped with electronic speed regulation module, synchronous module, load distribution module, interface card and other control modules, circuit breaker, display instrument and other configurations.   The parallel cabinet is generally the size of international electrical standard cabinet, and can also be processed according to the size required by users.   All indicating instruments on the cabinet, all control relays, change-over switches and potentiometers of the parallel generator set are imported or domestic high-quality products, and the protection level of the cabinet conforms to IP22 standard.   Parameter display: current, voltage, frequency, power, power factor meter   Today Starlight Power tell you how to install parallel cabinet for 250kw generator set.   1.Install the diesel generator set and parallel cabinet in place. 2.Connect the primary output cable of the diesel generator set with the corresponding par

250KW Cummins Water cooled Diesel Generator Set Commissioning

Diesel Genset Packed by Wooden Case for Delivery

3 Units Electric Diesel Power Generators with Yuchai Engine