Preparation before starting diesel generator set ① Complete inspection a. The switch of the control panel should be turned off before inspection, and be careful not to short-circuit the battery output electrode. b. Re-clean and inspect the machine room to ensure that there are no flammable and explosive materials around the unit, ensuring smooth and unobstructed air in and out of the machine room. c. Thoroughly inspect and ensure that the electrical and control parts are connected correctly, in good contact, reliable, and without aging. d. Check the reliability of the fastener and throttle adjustment system, confirm that the operating mechanisms are flexible, lightweight, and reliable, and check the pre-tightening of the water pump belt, charger belt and fan belt. e. Clean the surface of the generating set , especially the rotating part of the unit to ensure that there are no foreign objects, check to ensure that there is no coolant, fuel, oil leakage. ...
We share Technical Support and News about generators. Diesel generator set supply/Manufacture