instructions to Charge Storage Battery of Generator Set



Every diesel generator can not start without a battery, and the sufficient power of the battery is a necessary condition to ensure the success of the diesel generator. So how does the battery flush is correct?

Note:

1. Ensure that batteries are charged in a well-ventilated environment without sparks and open fires.

Do not charge in an environment without wind and snow, do not charge near water.

Remember to cut off the charger before removing the connector.

Static (municipal) chargers can be used to charge batteries, which should be disconnected from the connection of the generator set and charge diesel generator set with an external charger.

Charger and battery connection: charger should be connected to a suitable electricity, plug the following connection.

Joint connection:

battle line  Line 6

central line  line N1

earth wire Green / yellow line

Batteries should be connected in the following ways:

Battery connection method:

Positive terminal(+)  redline  negative (-) electrode Terminal  line black

The connection battery and charger can be connected as follows

Operation of charger: after the charger is connected to electricity, and the charger is connected to the battery, the charging steps are as follows: the electrolyte filter cap or exhaust hole cover is unplugged during the charging process. Check electrolyte water level and adjust it with distilled water when needed. Turn on the charger and observe the normal charge rate, which is determined by the battery capacity, depending on the new and old conditions of the battery and the current charging level. After charging begins, the charging current decreases and continues to decrease as the current voltage increases. The specific gravity of each battery solution is then measured by hydrometer.

Do not overcharge the battery, otherwise it will damage the battery. High temperature can also damage the battery, be careful during charging, especially in the hot climate, the battery temperature must not be higher than 45 degrees.

Note: when repairing and maintaining the starting battery of diesel generator set, wear acid-proof apron and face mask or protective goggles. Once the electrolyte splashes on the skin or clothing, rinse with plenty of water immediately.

Injection of electrolyte: Batteries are often dry in transit, so add the correct mix of specific gravity electrolytes. Remove the plug and pour into each cell until 8 mm above the top edge of the sheet, leaving the battery on for 15 minutes. Check and adjust the water level if necessary.


First chargeThe battery must be recharged for 4 hours within an hour of injection, with the following current, which allows the battery to be fully mixed, such as insufficient charging time can damage the capacity of the battery. The charging current of the battery model E017 is 9AMPs, and the charging current of E312 is 14AMPSU E324, the charging current is 20AMPS.

The above 4 hours of charging may be extended as follows:

Battery storage for more than 3 months, or temperature over 30 degrees or higher than BO% for 8 hours

Battery storage time over 12 hours a year.

If the current output of the charger is not enough, then the lower current can be achieved, but not less than one third of the above, but the time is lengthened proportionally. (8 hours 7AMPs instead of 4 hours 14AMPs).


At the end of the charging time, the electrolyte water level should be checked. If it is necessary to add the proper proportion of sulfite electrolyte, the exhaust plug will be put back to its original position.


Normal operation and charging can cause some water to evaporate, which requires the battery to be liquid from time to time. First clean the battery to avoid falling into the dirt, and then remove the exhaust plug. Add distilled water until 8MM (5 / 16) returns to the exhaust plug.

Storage battery is the key to open diesel generator set. In order to ensure fast and reliable start of diesel generator set, battery maintenance must be done well.

In the daily use of diesel generators, a very common fault is that the diesel generators cannot start normally, and most of the reasons for the failure of the diesel generator are the failure of the battery. Below are instructions used to solve the diesel generator battery failure and repair program.




Comments

Popular posts from this blog

New Yuchai engine YC6K600-D30 power for diesel generator 50Hz

Silent Cummins 640kw Diesel Generating Sets

Technical data of 800KVA AC diesel generator set The DG Set is skid mounted, directly coupled with Cummins water cooled engine with built in shock absorber for anti vibration. The alternator is Stamford brand with brushless and self excited, with control panel and protection system complete set. Prime power: 640KW/800KVA Standby power:704KW/880KVA Rated voltage: 230/400V Rated current: 1152A Speed/frequency:1500rpm/50Hz ( or 1800rpm/60Hz) Power factory:0.8lag Size: open type genset: 4.2 x1.82x2.25m, silent genset: 6.5 x2.6 x2.78m Net wight: open type genset: 7800kg,   silent genset : 12000kg Technical Data of Diesel Engine Diesel engine brand/model: Chongqing Cummins/ KTA38-G2B( full new) Prime/standby power: 790KW/920KW 4 Stroke Cycle , 60° Vee , 12 Cylinder, Turbocharged &Aftercooled, 1500rpm, 50Hz, bore/stroke: 159/159mm. The Cummins diesel engine is equipped with electronic type governor, over speed shutdown devices to protect against runaway when electronic governor or con...

Technical Parameters of Boduan 500KW Weichai Generator Set 6M33D572E200

  The 6M33D633E200 diesel engine is a special-purpose diesel engine for land-based power generation in the M33 series. It is a new-structure power generation diesel engine with a centrally - located turbocharger developed by Weichai Power Co., Ltd. in 2016. Continuous Power (COP): The maximum power at which the diesel engine can run continuously under a constant load with no limit on the annual operating hours. It is the ISO standard power. Prime Power (PRP): The maximum power at which the diesel engine can run continuously under variable loads with no limit on the annual operating hours. It is an ISO standard power that allows a 10% overload. Standby Power (ESP): The maximum power in a certain variable - power series that the diesel engine can operate for up to 200 hours per year. It is an ISO standard power with limited fuel consumption.   Operating Conditions and Applications of Baudouin  500KW Weichai Generator Set  Diesel Engine Power Classification Operating Co...