How to maintain Cummins diesel generating set?


Do well follow three maintenance method, it is entirely possible to extend the mid-repair of your generator to 8,000 to 10,000 hours, and the overhaul to 15000 to 18000 hours.

A level maintenance
1.When use Cummins generator,check and record the operating state of the generator per hour.(check and record the power output,frequency, Oil pressure,water temperature, charging, smoke exhaust of the generator per hour)
2.Before open the generator,must check engine oil level and water level.(Before open the generator, let genset race 8mins,load on the genset when the sound of generator is normal.)
3.When the machine stop working,after genset cooled,need to clean face of genset.(Need to load on generator set firstly,let generator set race 10mins,then close down,so that let the pressurized gas and penalty kick be fully cooled. )
B level maintenance
1. Repeat A level maintenance process.
2. Check battery water level half above zinc sheet 1cm
3. Check every machine belt tension ;
4. According diesel engine oil quality,change diesel oil grid every 200 hours to 300 hours;
5. Change generator oil grid every 250 hours to 300 hours;
6. Change wind grid every 500 hours(during working,can blow with wind gun 1time to 2 times)
7. Change water grid and add aqueous rust preventive every 500 hours.
8. Check control system every 500 hours or 3 months.
9. Clean water box heat sink network;
C level maintenance(every 3000 hours to 4000 hours maintenance by professional staff
1. Clean valve clearance of air door and adjust nozzle plunger stroke every 3000 hours to 4000 hours;
2. Clean ball bearing and inject lubricating oil every 4000 hours to 5000 hours;
3. Remove Holset turbocharger and remove carbon deposition,if necessary,change maintenance package of Holset turbocharger every 4000 hours to 5000 hours(This way can increase service life of Holset turbocharger)
4. Test the protection performance of the unit (such as: automatic shutdown of high water temperature, low voltage, overspeed, etc.);
5. Remove PT pump cleaning core every 3000 hours to 4000 hours;
6. Remove start motor and check carbon brush and contact copper sheet every 3000 hours to 4000 hours;
7. Remove battery charger and check carbon brush and bearing every 3000 hours to 4000 hours;




Comments

Popular posts from this blog

Yuchai Is Super Confident in Its Innovation

Founded in 1951, with 30 wholly-owned, holding and joint-stock subsidiaries, Guangxi Yuchai Machinery Group Co., Ltd. (hereinafter referred to as the Yuchai Group) is an internal combustion engine manufacturing base with the most complete spectrum of products in the country. In recent years, machinery manufacturing industry has been dropped off influenced by domestic and foreign economic situations, especially domestic overcapacity and unreasonable product structure. Reversely, Yuchai has sold over 3 million engines with the annualized revenues amount to RMB 40 billion. Over the years, as China ’ s largest engine R&D manufacturing base, Yuchai adjusts and optimizes its industrial structure and constantly strengthens its capacity for independent innovation. Therefore, the key technology continues to be the top in the sector for further keeping its own top leader in the industry. Innovation-Driven In 2013, seven world-class diesel-engine products for high-s...

How to Read Alarm Codes From SmartGen Genset Controller

Auto Module Control Panel is the configuration for nobody on duty controlling generators. This kind of panel adopts auto module control system, with large LCD display to show the menu, such as SmartGen controller. Features:   1. SmartGen 6110 can receive remote output signal from ATS and realize auto start and stop of generators. 2. SmartGen 6310 can realize all functions of 6110, add RS232 interface which can communicate with PC to realize remote operation.  3. SmartGen 6410 Auto Mains Failure controller, can realize all functions of 6310, furthermore can detect  ATS and control directly. The alarm of diesel generator controller is not the amount of stop alarm, which does not affect the normal operation of diesel generator. When the alarm occurs, the unit will not stop, and when the alarm conditions do not exist, the amount of warning will automatically disappear.  Today Starlight manufacturer mainly shares alarm codes for diesel generato...

How to know and solve faults of genset voltage transformer

 Today Starlight Power shares the common faults for voltage transformer of diesel generator set. Hope it is helpful to you. 1) The insulation between iron chips is damaged. Fault phenomenon: temperature rises during operation. The possible causes of the failure are: poor insulation between iron chips, bad use of environmental conditions or long-term operation under high temperature, which promote the insulation aging between iron chips. (2) Poor contact between grounding plate and iron core. Fault phenomenon: there is discharge sound between iron core and oil tank during operation. Cause of failure: the grounding plate is not inserted tightly, and the mounting screw is not tightened. (3) The iron core is loose. Fault phenomenon: abnormal vibration or noise during operation. The cause of failure: the iron core clamp is not clamped, and the iron chip is loose. (4) Turn to turn short circuit of winding. Fault phenomenon: during operation, the temperature rises, there is ...