Main installing requirements of Diesel engine

1. Installation of the crankshaft
During crankshaft installation, the main bearing bolts should be tightened from thrust gear(the third gear) to both ends in order, and in three steps:
① tighten to 60-80 N.m
② tighten to 160-180 N.m
③ tighten to 220-260 N.m
During every time, the crankshaft should be rotated to check the mobility. It should be able to rotate freely after the final tightening.The axial clearance should be between 0.1 and 0.27 mm.

2. Installations of the piston and the connecting rod
When installing the piston rings, put the surfaces marked upward( the second positive twist ring inner fillet upward). During positioning the piston-connecting rod assembly into the cylinder bore, stagger the joints in turn. And put the arrow marked on the top surface of piston towards the front end of the engine. Remember spreading some clean oil before tightening connecting-rod bolts. The tightening torque should be between 160-200N.m, and completed in three steps:
① tighten to 50-70 N.m
② tighten to 100-120 N.m
③ tighten to 160-200 N.m

3. Installation of the camshaft
Position the camshaft into the cylinder body with caution to make sure not scratch the surfaces of the journals, cams, and liners. And then install the cir clip, cam thrust plate, cam gear, and cam retainer, Finally,tighten fastening bolt with more than 300N.m tightening torque. The camshaft should be able to rotate freely, and its axial clearance is between 0.1-0.2mm.

4. Installation of the valves and valve guides
The valve guides should be pressed in at normal state with 20±0.3mm distances between their top surfaces and the surfaces of the cylinder head spring seats. Both the valve face angles of intake and exhaust valves are 45º. the valves and valve seat inserts should be grind in pair, and checked through kerosene. It must be guaranteed that kerosene do not leak within three minutes. The valve recession heights of the valves should be between 1±0.2mm.

5. Installation of the injectors
Before mounting the cylinder head, the injectors should be installed in the cylinder head first. The nozzles should protrude 3.4±0.1mm from the bottom surface of the cylinder head, which can be ensured by adjusting the width of the injector washer. And then remove the injectors to prepare for following installation. As long as adjusted, the injectors and washers can not be exchanged during installation.

6. Installation of the cylinder head
During cylinder head installation, the cylinder head bolts should be tightened to a tightening torque of between 210-250 N.m, do not finish that in once time and following the sequence shown in the following figure by three steps:
① tighten to 60-80 N.m
② tighten to 120-140 N.m
③ tighten to 210-250 N.m


7. Installation of the gear train
The crankshaft timing gear, injection pump gear, and camshaft gear should all be accordance with the timing requirement, so there are timing marks, which should be aligned during installing the gears, on them and timing idle gear. Oil the tooth surface after installing. The range of the gear meshing clearance is between 0.07-0.25mm.

Caution
1. every component should be cleaned before being installed, especially the oil passages, no dirt is permitted in them.
2. No corrosion, burr, or scratch is permitted on the fit surfaces of every component.
3. Friction surfaces and important fit surfaces should be oiled before installing.
4. Fit clearance( or interference) should be accordance with the requirement offered in the main fit clearance(or interference).

Comments

Popular posts from this blog

Components of Cummins PT Fuel System

When it comes to Cummins generator, it is well known that the gensets have good quality, low fuel consumption, low noise, big output power and reliable performance. The reliable stability, economy, power performance, durability and environmental safety is welcomed by customers. In last article, we talk about CCEC Cummins diesel engines operating principles. Well, in this article, you will learn what are the major components of its PT Fuel System. Fuel System The PT fuel system is used exclusively on Cummins Diesels. The identifying letters, “ PT ” are an abbreviation for “ pressure-time ” . The operation of the Cummins PT Fuel System is based on the principle that the volume of liquid flow is proportionate to the fluid pressure, the time allowed to flow and the passage size through which the liquid flows. To apply this simple principle to the Cummins PT Fuel System , it is necessary to provide: 1. A fuel pump. 2. A means of controlling pressure of

Leroy-Somer Alternator AVR R450

1 - GENERAL INFORMATION of Leroy-Somer Alternator AVR R450 1.1 - Description The R450 AVR is supplied in a casing designed to be mounted on a panel with dampers. - Operating temperature: - 30°C to + 65°C. - Storage temperature: - 55°C to + 85°C. - Shocks on the base: 9 g depending on the 3 axes. - Vibrations: less than 10 Hz, 2 mm half-peak amplitude 10 Hz to 100 Hz: 100 mm/s, above 100 Hz: 8 g. The AVR is IP00, it must be incorporated in an environment which ensures it a IP20 protection. 1.2 - Characteristic The connection is realised by “Faston” connectors and the voltage sensing is single - phase. 2 - POWER SUPPLY Both the SHUNT/AREP & PMG excitation systems are controlled by the AVR. 2.1 - AREP excitation system With AREP excitation, the electronic AVR is powered by two auxiliary windings which are independent of the voltage sensing circuit. The first winding has a voltage proportional to the   alternator   main voltage (Shunt characteristic),

New Yuchai engine YC6K600-D30 power for diesel generator 50Hz