Skip to main content

Archive

Show more

Diesel Engine Cylinder Head Installation and Removal



The object of the measurement is to determine selection of the cylinder head gasket. Clean the mating surface, the cylinder block sealing surfaces and the cylinder head. Use cleaning spirits and 885516 Gasket scraper. Install spacers (3) and 9998678 Gauge rod (1) on the engine block sealing surface. Set the dial indicator (2) to ”0”.

15 NOTICE! All pistons must be measured at TDC. Piston height above the Volvo engine block must be measured at measuring points (1) and (2) on all pistons. Pay attention to the measuring points, since the piston crown is domed.

16 Check that the piston is in its uppermost position, TDC. Place the dial indicator on the piston at measuring points (1) and (2). Read off and note the value on the dial indicator.

17 Compare the highest noted value with the table below. Determine the appropriate cylinder head gasket.
18 NOTICE! Check the contact surface before installation. Pay attention to the guide sleeves (1).
19 Position the cylinder head gasket with the marking toward the flywheel.
Cylinder Head, Installation

20 Lift the cylinder head into place. Pay attention to the guide sleeves.
21 NOTICE! Use new cylinder head bolts.
Lubricate the cylinder head bolts. Install the cylinder head bolts.
NOTICE! Tighten the bolts in in sequence, as
illustrated.
Tighten in three steps:
Step 1: 50 Nm (36.9 lbf. ft.)
Step 2: 130 Nm (95.9 lbf. ft.)
Step 3: 90°
22 Install the pushrods.
Rocker arm bridges and rocker arms,
installation
23 NOTICE! The push rods must not be under compression due to valve overlap during installation.
Install the rocker bridge with rocker arms. Align it with the pushrods and valves.
Tightening torque: 30 Nm (22.1 lbf. ft.)
24 Connect the fuel return line (1). Hold the adapter secure (2) and fit the hollow screw (3).
Tightening torque: 29 Nm (21.4 lbf. ft.)
25 Set the valve clearance according to Valves, Adjustment page 49.
26 Install the injectors according to Injector, Change page 123.

27 Install the common rail unit according to 23-7, Common Rail, Change.
28 Install the inlet manifold according to Intake Manifold, Change page 143.
29 Install the exhaust manifold according to Exhaust Manifold, Change page 152.
30 Install the turbocharger according to Turbo, Change page 174.
31 Install the thermostat housing according to 26-2, Thermostat Housing, Change.
32 Install the air filter housing.
33 Install new oil filters and fill with engine oil according to Oil filter, Change page 94.
34 Fill with coolant according to Coolant, Change page 187.
35 Turn the main switch on.
36 Start the engine and perform a function check.

Cylinder Head, Removal
TAD752GE, TAD753GE, TAD754GE
Tools:
885516 Gasket scraper
9998678 Gauge rod
NOTICE! The main switch must be in the off position before work is begun.
1 Cooling system drained; refer to Coolant, Change page 187.
2 Oil drained.

Removal

3 Remove the air filter housing.
4 Remove the turbocharger according to Turbo, Change page 174.
5 Remove the exhaust manifold; refer to Exhaust
Manifold, Change page 152.
6 Remove the inlet manifold; refer to Intake Manifold, Change page 143.
7 Remove the thermostat housing; refer to 26-2, Thermostat Housing, Change.

IMPORTANT!

Work on the fuel system demands exceptional cleanliness. Install protective plugs in open connections.
8 Remove the common rail unit according to 23-7, Common Rail, Change.
9 Remove the injectors; refer to Injector, Change page 123.
Rocker arm bridge, removal
10 Remove the cable holders (2 pcs.) and move them aside.
11 Undo the rocker arm bridge bolts alternately.
12 Remove the rocker arm bridge with rocker arms.

13 Mark up the valve yokes.
14 Remove the push rods (1).
15 Remove the valve yokes (2).
16 Remove the wiring connectors (1) and the cable holder nuts (2).
17 Lift away the wiring.

18 Remove the injector sleeve.

19 Remove the cylinder head bolts.
20 Attach a lifting eye to the front of the cylinder head.
21 Connect straps to the lifting eyes and lift the cylinder head to remove it.

Cylinder head, installation

Cylinder head gasket
22 The object of the measurement is to determine the selection of cylinder head gasket.
23 Clean the mating surface, the cylinder block sealing surfaces and the cylinder head. Use cleaning spirits and 885516 Gasket scraper.
24 Place spacing washers (3), 9998678 Gauge rod
(1) on the engine block sealing surface and set the dial indicator (2) to ”0”.

NOTICE! All pistons must be measured at TDC. 25 Piston height above the engine block must be
measured at two points (1) and (2) on all pistons. Pay attention to the measuring points, since the
piston crown is domed.

26 Check that the piston is in its uppermost position, TDC.
Place the dial indicator on the piston at measuring points (1) and (2).
Read off and note the value on the dial indicator.

NOTICE! Make sure the surface is clean before application. 28 Position the cylinder head gasket with the marking toward the flywheel.
Pay attention to the guide sleeves (1).

Cylinder Head

29 Lift the cylinder head into place. Pay attention to the guide sleeves.


NOTICE! Use new cylinder head bolts.
30 Lubricate the cylinder head bolts.
31 Install the cylinder head bolts.
NOTICE! Tighten the bolts in numerical order, as illustrated.
32 Tighten in three steps:
Step 1: 40 Nm (29.5 lbf.ft.)
Step 2: 95 Nm (70.1 lbf.ft.)
Step 3: 180°

33 Install the injector sleeve.
34 Check the harness seal.
35 Fit the wiring connectors (1) with lock washers, and tighten the plastic nuts (2).
36 Connect the harness terminal to the wiring connector
(1).
37 Allow the cable holder to hang free from the engine.
38 Fit the push rods (1).
39 Lubricate the valve stems.
40 Replace the valve yoke (2) in accordance with the earlier marking.



Comments

Popular posts from this blog

Components of Cummins PT Fuel System

When it comes to Cummins generator, it is well known that the gensets have good quality, low fuel consumption, low noise, big output power and reliable performance. The reliable stability, economy, power performance, durability and environmental safety is welcomed by customers. In last article, we talk about CCEC Cummins diesel engines operating principles. Well, in this article, you will learn what are the major components of its PT Fuel System. Fuel System The PT fuel system is used exclusively on Cummins Diesels. The identifying letters, “ PT ” are an abbreviation for “ pressure-time ” . The operation of the Cummins PT Fuel System is based on the principle that the volume of liquid flow is proportionate to the fluid pressure, the time allowed to flow and the passage size through which the liquid flows. To apply this simple principle to the Cummins PT Fuel System , it is necessary to provide: 1. A fuel pump. 2. A means of controlling pressure of

Leroy-Somer Alternator AVR R450

1 - GENERAL INFORMATION of Leroy-Somer Alternator AVR R450 1.1 - Description The R450 AVR is supplied in a casing designed to be mounted on a panel with dampers. - Operating temperature: - 30°C to + 65°C. - Storage temperature: - 55°C to + 85°C. - Shocks on the base: 9 g depending on the 3 axes. - Vibrations: less than 10 Hz, 2 mm half-peak amplitude 10 Hz to 100 Hz: 100 mm/s, above 100 Hz: 8 g. The AVR is IP00, it must be incorporated in an environment which ensures it a IP20 protection. 1.2 - Characteristic The connection is realised by “Faston” connectors and the voltage sensing is single - phase. 2 - POWER SUPPLY Both the SHUNT/AREP & PMG excitation systems are controlled by the AVR. 2.1 - AREP excitation system With AREP excitation, the electronic AVR is powered by two auxiliary windings which are independent of the voltage sensing circuit. The first winding has a voltage proportional to the   alternator   main voltage (Shunt characteristic),

New Yuchai engine YC6K600-D30 power for diesel generator 50Hz