Safety Procedures for Diesel Generator Set


The following is safety procedures:

1. The diesel engine-powered generator, the operation of engine section is carried out in accordance with the relevant regulations of the internal combustion engine.






2. Before starting the generator, it is necessary to carefully check whether the wiring of each part is correct, whether the joint parts are firm, whether the brush is normal, whether the pressure meets the requirements, and whether the grounding wire is good.

3. Before starting, put the resistance of the field varistor at the maximum position, disconnect the output switch, and the generator set with the clutch should disengage the clutch. Start the diesel engine with no load, and then start the generator after running smoothly.

4. After the generator starts running, always pay attention to whether there is mechanical noise or abnormal vibration. After confirming that the situation is normal, adjust the generator to the rated speed, adjust the voltage to the rated value, and then close the output switch to supply power. The load should be gradually increased to strive for three-phase balance.

5. The parallel operation of the generator must meet the same frequency, the same voltage, the same phase, and the same phase sequence.

6. Generators that are to be operated in parallel must have entered into normal and stable operation.

7. After receiving the signal of preparing for parallel connection, the whole unit shall be used as the standard to adjust the speed of the diesel engine and close at the synchronous moment.
8. Generators operating in parallel should adjust the load reasonably and distribute the active power and reactive power of each generator in a balanced manner. The active power is regulated by the diesel throttle and the reactive power is regulated by the excitation.

9. The generator in operation should pay close attention to the engine sound and observe whether the indication of various instruments is within the normal range. Check if the running part is normal and the generator temperature rise is too high. And make a good record of the operation.

10. When parking, reduce the load, restore the excitation varistor, reduce the voltage to the minimum, then cut off the switch in sequence, and finally stop the diesel engine.

11. If the diesel engine in parallel operation needs to stop one due to load drop, the load of one generator that needs to be parked should be transferred to the running generator, and then stopped by the method of single generator parking. If all parking is required, the load will be cut off first, and then the single generator will be shut down.

12. Mobile generators must be parked on a stable foundation before use. No movement is allowed when running.

13. When the generator is running, it should be considered to have voltage even if it is not excited. It is forbidden to work on the rotating generator lead-out line and touch the rotor or clean it by hand. Generators in operation must not be covered with canvas or other objects.

14. After the generator is overhauled, it is necessary to carefully check whether there are tools, materials and other debris between the rotor and the stator slot to avoid damage to the generator during operation.

15. All electrical equipment in the machine room must be grounded reliably.

16. It is forbidden to pile up sundries and flammable and explosive materials in the engine room. Except for the on-duty personnel, other personnel are prohibited from entering without permission.

17. The necessary fire-fighting equipment shall be provided in the machine room. When a fire accident occurs, the power shall be stopped immediately, the generator shall be turned off, and the fire extinguisher of carbon dioxide or carbon tetra-chloride shall be used for the rescue.


Comments

Popular posts from this blog

New Yuchai engine YC6K600-D30 power for diesel generator 50Hz

Technical Parameters of Boduan 500KW Weichai Generator Set 6M33D572E200

  The 6M33D633E200 diesel engine is a special-purpose diesel engine for land-based power generation in the M33 series. It is a new-structure power generation diesel engine with a centrally - located turbocharger developed by Weichai Power Co., Ltd. in 2016. Continuous Power (COP): The maximum power at which the diesel engine can run continuously under a constant load with no limit on the annual operating hours. It is the ISO standard power. Prime Power (PRP): The maximum power at which the diesel engine can run continuously under variable loads with no limit on the annual operating hours. It is an ISO standard power that allows a 10% overload. Standby Power (ESP): The maximum power in a certain variable - power series that the diesel engine can operate for up to 200 hours per year. It is an ISO standard power with limited fuel consumption.   Operating Conditions and Applications of Baudouin  500KW Weichai Generator Set  Diesel Engine Power Classification Operating Co...

Yuchai Is Super Confident in Its Innovation

Founded in 1951, with 30 wholly-owned, holding and joint-stock subsidiaries, Guangxi Yuchai Machinery Group Co., Ltd. (hereinafter referred to as the Yuchai Group) is an internal combustion engine manufacturing base with the most complete spectrum of products in the country. In recent years, machinery manufacturing industry has been dropped off influenced by domestic and foreign economic situations, especially domestic overcapacity and unreasonable product structure. Reversely, Yuchai has sold over 3 million engines with the annualized revenues amount to RMB 40 billion. Over the years, as China ’ s largest engine R&D manufacturing base, Yuchai adjusts and optimizes its industrial structure and constantly strengthens its capacity for independent innovation. Therefore, the key technology continues to be the top in the sector for further keeping its own top leader in the industry. Innovation-Driven In 2013, seven world-class diesel-engine products for high-s...