Skip to main content

Archive

Show more

The Maintenance Ways for 500kw Volvo Diesel Generator

If we can inspect and maintain 500kw Volvo generator after it runs for a long time, we will reduce more unnecessary troubles. So, how we should inspect and maintain? Please follow us.

1.Primary technical maintenance: 50-80 hours. (Added to the content of daily maintenance)
A. Replace and clean air filter if necessary. The air filter is an unconspicuous but important part of the whole diesel generator set. Once the air filter is too dirty, it may cause serious mechanical accidents, especially in the environment and areas with poor air quality. In order to avoid shortening the service life of diesel generator, after shutdown, check the air filter in time and whether the air filter is blockage and damage. If so, clean and replace it in time.
B. Check and replace the fuel filter and water filter;
C. Check the tension of the drive belt;
D. Add lubricating oil to all oil injection nozzles and lubricating parts;
E. Replace cooling water.

DSC01157_副本.jpg

2.Secondary technical maintenance: 250-300 hours. (Added to the contents of daily maintenance and primary maintenance)
A. Clean the piston, piston pin, cylinder sleeve, piston ring and connecting rod bearing of diesel generator regularly, and check its wear situation;
B. Check whether the inner and outer rings of the rolling main bearing are loose;
C. Remove the scale and sediment in the water channel of the cooling water system;
D. Remove the carbon deposit in the combustion chamber of the cylinder and the inlet and exhaust pipe;
E. Check the matching wear of valve, valve seat, push rod and rocker arm, and make grinding adjustment;
F. Clean the carbon deposit on the turbocharger rotor, check the wear situation of the bearing and impeller, and repair them if necessary;
G. Check whether the bolts of the coupling between the diesel generator and the diesel engine are loose and slip. If there is problem, should replace in time.

3.There-level technical maintenance: 500-1000 hours. (Added to the contents of daily maintenance, primary maintenance and secondary maintenance)
A. Check and adjust fuel injection lift angle;
B. Clean the fuel tank;
C. Clean the oil pan;
D. Check the atomization of fuel injection nozzle.

Diesel engine is easy to break down when diesel generator set runs for a long time, we must also pay attention to the overall inspection of the diesel engine. If not found and handled in time, the generator set may be damaged over time.
After the above technical maintenance, it can basically help the use of 500kw Volvo diesel generator, reduce the probability of failure, and extend the service life.

4.Medium maintenance
After the diesel generator set runs total 6000-8000 hours, we can carry out medium maintenance. The specific maintenance contents are as follows:
A. Check the wear degree of the valve and valve seat, and repair or replace if necessary;
B. Check the working condition of PT pump and fuel injector, repair and adjust if necessary;
C. Check and adjust the torque between connecting rod and every fastening screw;
D. Check and adjust the valve clearance of diesel generator set;
E. Adjust the fuel injector stroke;
F. Check and adjust the tension of fan charger belt;
G. Clean the carbon deposit in the intake branch pipe;
H. Clean intercooler core;
I. Clean the whole oil lubrication system of the diesel generator set;
J. Clean the oil sludge and metal scrap of rocker arm chamber and oil pan;
K. Check the easy-to-break parts of cylinder liner, piston, piston ring, intake and exhaust valve, etc. crank and connecting rod mechanism, gas distribution mechanism, lubrication system, cooling system. Replace if necessary;
L. Check the fuel supply system of diesel generator set and adjust the oil nozzle of oil pump;
M. Repair and test the electric ball of the generator, clean the grease and sediment, and lubricate the electric ball bearing.

In order to prolong the service life of 500kw Volvo diesel generator set, attention should be paid to maintenance. Be sure to unload the load before shutdown, and do not shut down with load. Try not to operate the generator set with high power for a long time under the condition of poor environment, and check it regularly.

Jiangsu Starlight company is OEM partner of Sweden Volvo Penta company in Asia Pacific region. Volvo series diesel generator set produced by Jiangsu Starlight company has a good sales, which in top three. If you would like to ask price and details, please contact us.

Comments

Popular posts from this blog

Components of Cummins PT Fuel System

When it comes to Cummins generator, it is well known that the gensets have good quality, low fuel consumption, low noise, big output power and reliable performance. The reliable stability, economy, power performance, durability and environmental safety is welcomed by customers. In last article, we talk about CCEC Cummins diesel engines operating principles. Well, in this article, you will learn what are the major components of its PT Fuel System. Fuel System The PT fuel system is used exclusively on Cummins Diesels. The identifying letters, “ PT ” are an abbreviation for “ pressure-time ” . The operation of the Cummins PT Fuel System is based on the principle that the volume of liquid flow is proportionate to the fluid pressure, the time allowed to flow and the passage size through which the liquid flows. To apply this simple principle to the Cummins PT Fuel System , it is necessary to provide: 1. A fuel pump. 2. A means of controlling pressure of

Leroy-Somer Alternator AVR R450

1 - GENERAL INFORMATION of Leroy-Somer Alternator AVR R450 1.1 - Description The R450 AVR is supplied in a casing designed to be mounted on a panel with dampers. - Operating temperature: - 30°C to + 65°C. - Storage temperature: - 55°C to + 85°C. - Shocks on the base: 9 g depending on the 3 axes. - Vibrations: less than 10 Hz, 2 mm half-peak amplitude 10 Hz to 100 Hz: 100 mm/s, above 100 Hz: 8 g. The AVR is IP00, it must be incorporated in an environment which ensures it a IP20 protection. 1.2 - Characteristic The connection is realised by “Faston” connectors and the voltage sensing is single - phase. 2 - POWER SUPPLY Both the SHUNT/AREP & PMG excitation systems are controlled by the AVR. 2.1 - AREP excitation system With AREP excitation, the electronic AVR is powered by two auxiliary windings which are independent of the voltage sensing circuit. The first winding has a voltage proportional to the   alternator   main voltage (Shunt characteristic),

New Yuchai engine YC6K600-D30 power for diesel generator 50Hz